Powered By Blogger

Monday, March 28, 2011

Steady progress at Heritage

The sanctuary floor is newly repaired, caulked, and epoxy sealed. The
walls have been repaired and painted. New carpet for the center aisle
and chancel platform was being installed on Saturday. The sanctuary is
looking better than ever.

We will continue to use the old entry as our main point of entry, and
the doors on the altar end of the sanctuary will remain the main
entry/exit for the sanctuary. The new (north) entry will be open and
available, but there is no access to coat room or restrooms.

[source:  Pastor Anderson]

No comments:

Post a Comment